Electrification and Repair Efforts in Mizoram: Challenges and Progress

Mizoram's Power and Electricity Minister, F Rodingliana, detailed efforts to electrify 45 unelectrified villages. Sanctions and contractors are in place, with supplies reaching sites under the Revamped Distribution Sector Scheme. Transformer maintenance faces delays due to logistics and road conditions, but measures to boost supply and replace corroded poles are underway.

Electrification and Repair Efforts in Mizoram: Challenges and Progress
This image is AI-generated and does not depict any real-life event or location. It is a fictional representation created for illustrative purposes only.
  • Country:
  • India

In Mizoram, 45 villages remain unelectrified, according to Power and Electricity Minister F Rodingliana. In response to queries from opposition BJP member Prova Chakma, the minister affirmed that efforts to bring electricity to these areas are ongoing.

Under the Revamped Distribution Sector Scheme, sanctions have been secured, and three contractors are set to electrify these remote locations. Initial supplies are now reaching designated sites.

The minister acknowledged widespread transformer issues, with 71 currently awaiting repair due to logistical challenges and road conditions. In response, a multi-step repair process is in place, and backup stocks are maintained when possible. Efforts to replace corroded electric poles and extend Low Tension lines are also planned, utilizing government funds.

TRENDING

OPINION / BLOG / INTERVIEW

Teachers must adapt as AI and rapid change transform classrooms, OECD warns

Digital Scams Surge Globally, Threatening Trust in the Expanding Digital Economy

Education Rise and Gender Imbalance Are Redrawing China’s Marriage Landscape

IMF Study Urges Serbia to Track Hidden Costs of Tax Breaks and Improve Transparency

DevShots

Latest News

Connect us on

LinkedIn Quora Youtube RSS
Give Feedback