Govt Launches PRISM-SG Portal to Fast-Track Bridge Projects, Cut Approval Time by 70%
This is expected to accelerate the construction of Road Over Bridges and railway infrastructure, improving connectivity and reducing bottlenecks.
- Country:
- India
In a major push to modernise infrastructure delivery, the government has launched the PRISM-SG Portal (Portal for Rail-Road Inspection & Stages Management – Steel Girders), a digital platform aimed at streamlining approvals and inspections for Road Over Bridges (ROBs).
The portal was jointly launched by Union Minister for Road Transport & Highways Shri Nitin Gadkari and Union Minister for Railways, IT & I&B Shri Ashwini Vaishnaw, marking a significant step towards digitisation, transparency, and faster project execution.
From 12 Months to 3–4 Months: Major Time Reduction
One of the biggest impacts of the PRISM-SG portal will be the drastic reduction in approval timelines:
-
Current process: ~12 months
-
With PRISM-SG: 3–4 months
This is expected to accelerate the construction of Road Over Bridges and railway infrastructure, improving connectivity and reducing bottlenecks.
End-to-End Digital Workflow for Bridge Approvals
The portal introduces a fully digital, integrated workflow, covering:
-
Online submission of documents
-
Automated scrutiny and query resolution
-
Digital approvals and scheduling of inspections
-
Uploading of inspection reports, photos, and test results
-
Real-time tracking with complete audit trail
This eliminates dependence on manual processes and enhances accountability and efficiency.
Bridging a Critical Gap in Existing Systems
Until now:
-
General Arrangement Drawings (GAD) and structural approvals were handled digitally via the RRCAS portal
-
However, key processes like Quality Assurance Plan (QAP), Welding Procedure Specification Sheet (WPSS), and fabrication inspections remained offline
This fragmentation led to:
-
Delays in approvals
-
Lack of coordination among agencies
-
Limited transparency
The PRISM-SG portal addresses these gaps by bringing all processes onto a single digital platform.
Unified Platform for All Stakeholders
The portal integrates all key stakeholders involved in ROB construction:
-
Road Owning Departments
-
Indian Railways
-
Contractors and fabricators
-
Inspection and quality assurance agencies
This unified approach ensures better coordination, faster decision-making, and seamless communication.
Strengthening Quality and Monitoring
The platform also enhances quality control mechanisms by digitising:
-
Quality Assurance Plans (QAP)
-
Welding Procedure Specifications (WPSS)
-
Fabrication stage inspections of steel girders
Real-time monitoring and documentation ensure higher construction standards and traceability.
Boost to Infrastructure and Connectivity
With thousands of ROBs required across India to ease traffic congestion and improve rail-road integration, the PRISM-SG portal is expected to:
-
Speed up project execution timelines
-
Improve transparency and governance
-
Enhance public infrastructure delivery
-
Reduce costs associated with delays
Digital Transformation of Infrastructure Governance
The launch reflects a broader government push towards:
-
Digital governance in infrastructure
-
Data-driven project management
-
Seamless inter-ministerial coordination
By reducing procedural delays and improving oversight, PRISM-SG is set to play a crucial role in building faster, safer, and more efficient transport infrastructure.
ALSO READ
-
Cabinet clears modified regional air connectivity scheme UDAN with an outlay of Rs 28,840 crore: Union Minister Ashwini Vaishnaw.
-
Cabinet approves access-controlled four-lane Barabanki-Bahraich road project at Rs 6,969 crore in UP: I&B Minister Ashwini Vaishnaw.
-
Cabinet approves Bharat Audyogik Vikas Yojana with an outlay of Rs 33,660 crore: I&B Minister Ashwini Vaishnaw.
-
Cabinet approves proposal to declare Madurai airport as international airport: Union Minister Ashwini Vaishnaw.
-
Cabinet approves extension of Jal Jeevan Mission up to December 2028: Union Minister Ashwini Vaishnaw.