Rajasthan to Host India's First Vande Bharat Sleeper Coach Maintenance Hub
India's first facility for maintaining Vande Bharat train sleeper coaches is to be established in Jodhpur, Rajasthan, ready by mid-2026. It boasts advanced machinery and technical partnerships with Railway Vikas Nigam Limited and Kinet Railway Solution, aiming for high-tech precision and safety in maintenance operations.
- Country:
- India
India is set to launch its first designated maintenance facility for Vande Bharat sleeper coaches in Jodhpur, Rajasthan by mid-2026. The North Western Railway project stands at a significant Rs 360 crore investment, highlighting a new era of precision and safety focus for Indian Railways.
Senior Divisional Mechanical Engineer Major Amit Swamy announced the first phase of the establishment will include a 600-metre track to maintain 24 sleeper coaches, with completion anticipated by June 2026. A second phase, featuring a workshop and simulator with a 178-metre track, will be completed by June 2027, all at Bhagat Ki Kothi Railway Station.
Equipped with advanced machinery and specialized testing labs, the facility stands as India's forefront depot for Vande Bharat maintenance. Notably, a joint venture between Railway Vikas Nigam Limited and Kinet Railway Solution drives the technology. Expected to service eight to nine trains daily, this is a pivotal development in high-speed rail maintenance in India.
ALSO READ
-
PM Modi flags off 4 new Vande Bharat trains from Banaras railway station
-
Ernakulam-Bengaluru Vande Bharat Express flagged off by PM Narendra Modi
-
'Proud of Kashi's talented kids': PM interacts with children after flagging off Vande Bharat trains
-
Holy sites connected by Vande Bharat joins India's culture with development: PM Modi
-
India's Infrastructure Leap: Vande Bharat Trains and Spiritual Tourism