NHAI Expands Connectivity with Major Widening Project

The NHAI has started widening a key carriageway from two-lane to four-lane at Subroto Park Air Force Station to improve traffic flow between Dhaula Kuan and Delhi Airport. The project aims to remove traffic bottlenecks, enhance pedestrian safety, and incorporate environmental sustainability measures.


Devdiscourse News Desk | New Delhi | Updated: 07-11-2025 20:17 IST | Created: 07-11-2025 20:17 IST
NHAI Expands Connectivity with Major Widening Project
This image is AI-generated and does not depict any real-life event or location. It is a fictional representation created for illustrative purposes only.
  • Country:
  • India

The National Highways Authority of India (NHAI) announced on Friday an ambitious project aimed at alleviating traffic congestion and enhancing connectivity in one of Delhi's busiest corridors, the route between Dhaula Kuan and Delhi Airport. The NHAI has begun expanding the Limited Height Subway near Subroto Park Air Force Station from two lanes to four.

This initiative will address the traffic bottleneck currently experienced at the start of the Parade Road underpass, restricting movement towards Gurugram. The project involves the relocation of nearby infrastructure such as drains and peripheral roads, with completion anticipated in approximately six months.

A new foot over bridge is also planned to provide safer pedestrian connectivity, alongside improved drainage systems for efficient water disposal. Environmental aspects are a key focus, including tree transplantation and pollution control measures. The project promises significant improvements in the National Capital Region's infrastructure and transportation, benefiting both commuters and local residents.

TRENDING

DevShots

Latest News

OPINION / BLOG / INTERVIEW

Cyber-resilient electric mobility: AI shields EV charging stations from cyber-attacks

AI can decode medical records with near-human accuracy

New AI model could save historic monuments before they crumble

How AI systems must prove trust, transparency and reliability before clinical use

Connect us on

LinkedIn Quora Youtube RSS
Give Feedback